博文

目前显示的是标签为“Advantages of bolted ball nodes”的博文

Featured Articles

What are the key points to consider when establishing a mineral warehouse on the coast of Nigeria?

图片
👉 Project location: Nigerian coast 👉 Project type: Mine warehouse (span 100 metres, length 125 metres) 1. Structural Design  Span and Length:  The mine warehouse has a span of 100 metres and a length of 125 metres, employing a large-span steel structure design to ensure structural stability and load-bearing capacity.  It is recommended to use a steel truss structure or space frame structure to meet the large-span requirements and optimise material usage.  The structural design must consider wind loads, seismic loads, and dynamic loads during the operation of the bucket wheel excavator. Foundation Design:  Since the project is located by the sea, the foundation may be relatively soft. It is recommended to use deep foundation design (such as pile foundations) to ensure structural stability.  Foundation construction must consider the impact of groundwater levels and saline-alkali environments, and foundation reinforcement should be carried out when necessa...

Advantages of bolted ball nodes

图片
 As welding technology encounters the twin challenges of curved space surfaces and oversized spans, the bolted ball node, with its unique structural intelligence, is reshaping the engineering logic of modern steel buildings . I. the welding technology of the space dilemma   The rigid yoke of geometric constraints In the construction of a shaped roof of an art museum, the complex intersection of double-curvature steel beams made the traditional welding encountered technical bottlenecks. Local deformation caused by heat input so that the 16mm thick plate to produce 0.3mm/mm waviness, even with the segmented welding process, still can not meet the surface accuracy requirements, and ultimately forced to cut and replace 23% of the components.   Spatial Conduction of Residual Stress After welding the 120m span truss of an international exhibition centre, the residual stress triggered an 8cm arching deformation of the overall structure. Although 65% of the stress was removed b...