博文

目前显示的是标签为“Membrane structure”的博文

Featured Articles

What are the key points to consider when establishing a mineral warehouse on the coast of Nigeria?

图片
👉 Project location: Nigerian coast 👉 Project type: Mine warehouse (span 100 metres, length 125 metres) 1. Structural Design  Span and Length:  The mine warehouse has a span of 100 metres and a length of 125 metres, employing a large-span steel structure design to ensure structural stability and load-bearing capacity.  It is recommended to use a steel truss structure or space frame structure to meet the large-span requirements and optimise material usage.  The structural design must consider wind loads, seismic loads, and dynamic loads during the operation of the bucket wheel excavator. Foundation Design:  Since the project is located by the sea, the foundation may be relatively soft. It is recommended to use deep foundation design (such as pile foundations) to ensure structural stability.  Foundation construction must consider the impact of groundwater levels and saline-alkali environments, and foundation reinforcement should be carried out when necessa...

What are the advantages of membrane structure?

图片
  What are the advantages of membrane structure? Membrane structure 1. Artistic: novel and beautiful, reflecting the beauty of the structure, and rich in color. 2. Economy: because the membrane has a certain light transmission rate, the lighting intensity and time can be reduced during the day, which can save energy very well. 2. Economy: Since the membrane has a certain light transmission rate, it can reduce the intensity and time of lighting during the day, which can save energy well. 3. Large span: membrane structure can fundamentally overcome the difficulties encountered in the realization of traditional structures on large span (unsupported) buildings. 4. Self-cleaning: the use of membrane materials with protective coating in membrane buildings can give the building a good white clean effect while ensuring the service life of the building. 5. Short construction period: all processing and production in membrane building projects are done in the factory, which can reduce the co...