Featured Articles

Corrosion Protection Processes and Quality Control for Steel Structures

图片
 Corrosion Protection Process for Steel Structures Corrosion protection processes for steel structures are essential for ensuring that steel structures remain in good condition over the long term. This article provides a detailed overview of the various steps involved in these processes, including surface preparation, priming, coating application, quality control, and final inspection and acceptance. Surface treatment Surface preparation is the first step in the corrosion protection process. Its primary purpose is to remove dirt, grease, rust, and other contaminants from the surface of steel structures to improve coating adhesion and corrosion protection. Surface preparation includes the following steps: Cleaning: Removing grease, dirt, and dust from the surface of steel structures using solvents or detergents. Degreasing: Removing grease and wax-like substances with an alkaline degreaser to improve coating adhesion. Rust Removal: Removing rust and other corrosion products from the...

Bolt Ball Testing Methods

 Bolt Ball Testing Methods

bolt ball



1, bolt ball and manufacturing bolt ball nodes need materials, its varieties, specifications, performance, etc. should comply with national product standards and design requirements.
Inspection methods: check the quality of the product qualified documents, Chinese signs and inspection reports, etc.
2Bolt ball shall not have burn, crack and crease.
Inspection method: Sample part of each specification of bolt ball, observe with 10 times magnifying glass and surface inspection.
3, bolt ball thread size and thread tolerance should be in line with the current national standard provisions.
Inspection method: check a part of each specification of the bolt ball and measure it with a standard thread gauge.
4, bolt ball diameter, roundness, adjacent two bolt hole centre line angle and other dimensions and allowable deviation should be in line with the local steel structure acceptance regulations.
5Inspection method: Sample a portion of each specification of bolt ball and check if it conforms to the specified value with calipers and indexing head gauge.
___________________

Whatsapp/Tel: 17712952852
E-mail:safs121@safsteelstructure.com
Website:www.safsteelstructure.com/

评论

此博客中的热门博文

What is a coal bunker?

What is the difference between a single-layer reticulated shell and a double-layerreticulated shell?

What are the differences between bolted ball grids and welded ball grids?