 Corrosion Protection Process for Steel Structures Corrosion protection processes for steel structures are essential for ensuring that steel structures remain in good condition over the long term. This article provides a detailed overview of the various steps involved in these processes, including surface preparation, priming, coating application, quality control, and final inspection and acceptance. Surface treatment Surface preparation is the first step in the corrosion protection process. Its primary purpose is to remove dirt, grease, rust, and other contaminants from the surface of steel structures to improve coating adhesion and corrosion protection. Surface preparation includes the following steps: Cleaning: Removing grease, dirt, and dust from the surface of steel structures using solvents or detergents. Degreasing: Removing grease and wax-like substances with an alkaline degreaser to improve coating adhesion. Rust Removal: Removing rust and other corrosion products from the...

Precautions for space frame construction

 All kinds of steel pipe scaffolders set up for the construction of the grid must be prepared special safety construction organization design and special design calculation, in the operation should comply with the relevant provisions.

When a mobile scaffold operation platform is set up, the scaffold pole should be welded on the channel steel, and the longitudinal and transverse sweeping poles must be set at 200mm away from the channel steel surface. Scaffolding ramp and rest platform, working layer surrounding protection and foot and hand board laying shall comply with relevant regulations.

Mobile scaffolding must comply with the provisions of special safety construction organization design when towing.

Each time the scaffold is dragged, there should be special command, special observation, first try to drag 1 ~ 2m, check the deformation of the shelf, and confirm that there is no deformation before it can be formally dragged. After towing and positioning, the deformation and idleness of the scaffold should be comprehensively checked to confirm that there is no deformation before it can be used.

Steel bolt balls, rods and other components of the space frame should be hoisted to the scaffold platform in batches. It shall not be piled on the shelf platform in large quantities at one time, and it shall be installed and transported with it.



The operator on the scaffold platform should be minimized, and no one should be concentrated in a span of the scaffold during the operation.

The operator who installs the steel bolt ball and rod on the grid body should use the safety belt, the safety belt should be hung on the solid structure, and the installer must be equipped with a tool bag and tool hooks.

When the grid is dragged or jacked, all equipment should be fixed firmly, the operating position should be set up a firm operating platform, and should be set up walking handrails or protective railings. No one should stay on the frame while towing or jacking.

评论

此博客中的热门博文

What is a coal bunker?

What is the difference between a single-layer reticulated shell and a double-layerreticulated shell?

What are the differences between bolted ball grids and welded ball grids?