 Corrosion Protection Process for Steel Structures Corrosion protection processes for steel structures are essential for ensuring that steel structures remain in good condition over the long term. This article provides a detailed overview of the various steps involved in these processes, including surface preparation, priming, coating application, quality control, and final inspection and acceptance. Surface treatment Surface preparation is the first step in the corrosion protection process. Its primary purpose is to remove dirt, grease, rust, and other contaminants from the surface of steel structures to improve coating adhesion and corrosion protection. Surface preparation includes the following steps: Cleaning: Removing grease, dirt, and dust from the surface of steel structures using solvents or detergents. Degreasing: Removing grease and wax-like substances with an alkaline degreaser to improve coating adhesion. Rust Removal: Removing rust and other corrosion products from the...

How many quality control points need to be implemented for the safety control of the space frame structure?

 

space frame

1The material must meet the design requirements.

2The design of the spherical space frame must conform to the corresponding specification standards.

3The quality control of assembling process.

4The one-way axial tensile and compressive bearing capacity test of the ball node is as strong as the parent material requirements.

5Bolt ball node for the thread of the largest bolt hole of the finished ball for tensile strength test.

6The installation of the space frame should be the first control construction and installation program to have a practical grasp.

7The reference axis and the elevation of the top of the column must conform to the design and standards.

8, focus on controlling the deflection value of the space frame under self-weight and load, the average deflection value of the measurement point shall not be greater than 1,15 times the design value.

__________________________________

Whatsapp/Tel:+ 86/13056229023

E-mail:safs121@safsteelstructure.com

Website:www.safsteelstructure.com

评论

此博客中的热门博文

What is a coal bunker?

What are the differences between bolted ball grids and welded ball grids?

What is the difference between a single-layer reticulated shell and a double-layerreticulated shell?